Skip navigation

Civil Engineering and Operations Research, 1931-2000

Items (Sorted by Submit Date in Descending order): 601 to 620 of 1195
Issue DateTitleAuthor(s)
1987Recommendation for a Financial Analysis of College Pro PaintersMeyer, Thomas Alton
1977Recharge Basins: An Experimental StudySeidel, Allan Keith
1988Real-Time Simulation of Vehicular Traffic FlowUmland, David Scott
1990Real-Time Dispatching for Truckload Motor Carriers: A Comparison of Graphics-Assisted Manual Dispatching and Optimization-Based DispatchingO'Connor, Brendan Michael
1983Real Time Automated Flood Warning Systems - A Cost Benefit Analysis Framework Applied to Yantic, ConnecticutCostello, Bernard Peter
1992Rationalizing the Transportation System of the Former Soviet UnionKalkstein, Hobart C.
1977A Solar Thermal Nuclear Breeder Model to Meet the Energy Demands of the United StatesPecks, Paul David
1984Railroad Regulation: Past, Present and FutureKelly, Valerie Lynn
1983Railroad Freight Car Management: Temporal and Spatial Imbalances of Supply and DemandPalocz, Spencer Felix
1978Railroad Consolidation, Route Choice, and Industry ViabilityFehm, David Michael
1980Rail and Truck Energy Consumption: A "Realistic" Comparison MethodologyEberhardt, Douglas Patrick
1994Radon Gas: The Silent Killer- A Risk Assessment of Indoor Radon Levels in New JerseyServedio, Dominique P.
1977Radioactive Waste: An Inventory and Two Methods of DisposalHammond, Jr., William Henry
1994Radar Visualization and Hydrometeor Identification Using the WSR-88DLeCuyer, Nicholas A.
1982Queuing Theory Applications and Considerations in the Design of Upstream Line-Concentrator-Type Data Communications DevicesDonatiello, Jr., Nicholas E.
1995A Socio-economic Analysis of the Rehabilitation of the Queensboro BridgeVanderbilt, Nicole
1984Quantitative Methods in Testing New Consumer ProductsVuong, Qui Tu
1980Quantitative Methods for the Analysis of International Investment ClimatesPatalita, John Dybas
1990Quantification of Construction Project Risk: A Simulation ApproachHenricks, Robert Chess
1991Quality Control in Manufacturing Case Study: Kunnan IndustriesFinck, Gregory A
Items (Sorted by Submit Date in Descending order): 601 to 620 of 1195